This is a Passivhaus Basics blog post that gives an overview of a specific aspect of the Passivhaus Standard.

The international Passivhaus Standard is a clearly defined and rigorous standard for energy efficiency, comfort and quality assurance of buildings. Designing a building to achieve the standard requires detailed knowledge and a rigorous methodical approach to design and documentation. To ensure this happens, it is possible to train and qualify as a Certified Passivhaus Designer or Consultant.

The route to certification is the same for a designer or a consultant. It is only the individual’s prior qualifications and experience that determines if they qualify as one or the other. For clarity, this post will only refer to a Certified Passivhaus Designer, but for all intents and purposes, ‘designer’ is interchangeable with ‘consultant’ in this context.

A Certified Passivhaus Designer, regardless of their prior qualification, works across disciplines on a Passivhaus project. Their role integrates architecture, structure, building services, building science, energy modeling and construction detailing. They will at times both support and challenge the other designers on a Passivhaus Project.

The Certified Passivhaus Designer on a project doesn’t need to be completely independent. They can also be the architect, structural engineer, building services engineer, or another consultant on the team. And the same person fulfilling two roles does have advantages. However, in many cases combining two roles requires more time and work than one individual has available. Regardless, it is best if the Certified Passivhaus Designer is an integral part of the design team rather than just an occasional consultant.

The Passivhaus Building Certifier must be independent of the design team.

A Certified Passivhaus Designer brings the detailed knowledge and rigorous methodical approach needed to design buildings to the international Passivhaus Standard.

043 What is a Passivhaus Designer

Continue reading

Design and build procurement routes have been particularly popular in the UK for large scale Passivhaus projects. Clients, often public bodies, want the benefits that Passivhaus brings, but are wary of the delivery risks in a relatively immature Passivhaus market. Using a design and build procurement route allows the client to pass the majority of the risks to the contractor. The client may pay a higher price for this, but theoretically, it offers more certainty of cost and time.

However, using a design and build procurement route can offer the greatest potential for an integrated design approach. And this is beneficial for a Passivhaus building project. When it is done right, the full design and construction teams can collaborate to develop a highly integrated solution. Unfortunately, when not done right, design and build procurement can conflict with an integrated design approach.

This blog post looks at three situations where design and build procurement can conflict with Passivhaus;

  1. Design scope mismatch
  2. Consultants timelines out of sync
  3. Tender design overconstrained

These situations can cause issues with any building project and may increase costs and delivery time. For a Passivhaus building project, these situations may additionally jeopardise achieving the standard.

Passivhaus design and build procurement: avoid situations that conflict with an integrated design approach.

Procurement Conflicts with Passivhaus

Continue reading